NE 6 Avenue Water Main Replacement

Project Limits

  • NE 6 Avenue from 137 Street to 148 Street

Scope of Work

  • Design the system to meet the needs of the community
  • Replace two existing lines with one main line

Project Timeline

  • Complete

Project Team

Consultant

  • Tetra Tech

Contractor

  • RP Utility